As part of the Belsize Flood Resilience project, and in order to better understand the flood risk in St Denys, Southampton City Council commissioned a report from URS Infrastructure & Environment UK Limited. Activities undertaken to prepare this report included:
- bore holes were drilled to monitor the interaction between ground water and the tides.
- A CCTV survey was carried out of the local rainwater sewers
- the height of water in the River Itchen was monitored near Priory Road Hard and at Woodmill
- an area flood model was developed.
The report and the accompanying 7 appendices is available for viewing as pdf files: